Wednesday, December 8, 2010

Building Inspection Reports

NSW Labour MP Matt Brown is today releasing the results of a Vendor Disclosure review, recommending that vendors selling by auction must supply pest and building inspection reports. He is restricting his proposal to auctions because people buying by private treaty have a cooling off period during which they can conduct their own inspection and withdraw from the sale if the results are bad, losing only the cost of the report and the .25% deposit.

The review recommends that
  • the vendor must supply all reports done in the 90 days before the property was put on the market. This will prevent the vendor cherry picking through reports until an inspector doesn't notice something significant.
  • the buyer would have a legal right to sue the inspector (as now) if problems are found after purchase that should have been in the report.
  • the inspector must have $5M professional indemnity insurance.

A public forum on the topic was told that $40M of wasted reports were generated in NSW by unsuccessful bidders at auctions. Many other buyers bid at auction without having a report, not willing to gamble the inspection fee against the uncertainty of whether they will win the auction.

Mary Macken, president of the NSW Law Society, opposes the proposals. "It puts a clumsy foot through delicate contractual architecture," she said.

One might think the Law Society would relish the proposal. Vendors will select inspectors with a sympathetic reputation, and there will be endless legal battles as a result, when buyers do find things wrong, with the courts having to decide whether the inspector was negligent, and if so how much compensation must be paid. At present a buyer having doubts about a property can arrange for a thorough inspection to be done, and buy or decline to bid with confidence.

Perhaps a more important step would be to punish estate agents who give demonstrably false low estimates of the price a property will sell for. Unscrupulous agents do this to persuade people to invest in a building inspection, after which such would-be buyers feel compelled to go on bidding way above the promised price, both to protect their investment and in the mistaken belief the bidding will end soon. Maybe the losing buyer should be able to sue the estate agent to recover the cost of the inspection, if he can convince the court that he was 'conned' into having the inspection performed when the sale price of the property was way above what he was told.

The report will be considered by Cabinet and could be in place before the March election.

Wednesday, December 1, 2010

"Wide Anger over M2 Widening"

That's the headline of an article in the latest Monthly Chronicle. The article relates to Transurban's plan to build construction camps in Waterloo Park Marsfield, and to the uncertainty about Transurban's intentions for the Kirkham Road Bridge.
The article also quotes Greg Smith SC as saying in Marsfield it's not just the park that is under threat. Irreplaceable horse agistment paddocks are believed to be under threat by the construction camp, but no community consulation has taken place to clarify intentions.
Regarding the Kirkham Road Bridge, clearly Transurban need very quickly to make it absolutely clear that they do not intend to close the bridge! Until that issue is put to bed, it will feed the growing resentment about other issues related to the M2 project.

Tuesday, November 30, 2010

Beecroft Cheltenham Civic Trust

As a member of the BCCT, I received my renewal letter today from Michael Stove, President of the Beecroft Cheltenham Civic Trust who writes as follows:

"Please help us to help you present your thoughts & ideas before the various government and other respective authorities. Renew your memberships and look to your friends and neighbours to join up. We require those small individual amounts to assist us continue with our efforts on your behalf."

It's $10 per year for individual membership, $20 for family membership. Membership forms can be obtained on the BCCT website, http://www.2119.org.au/.

With so many major issues affecting our Beecroft and Cheltenham environment at the moment, I believe the BCCT needs to have very many more members than they now do in order to provide a more powerful lobby speaking on our behalf. Unfortunately the Trust's IT manager has been unwell, and the website has not been updated to reflect recent events, but I am assured this will be changing very soon.

If you want to see the importance of lobbying, see how the cycling community has captured the debate about the M2. If you Google "M2 Widening Project", BikeNorth comes up at top of page one, ahead of Government sites as well as any other community sites! As a result of their well organised, co-ordinated activity and sustained pressure, the M2 project is spending huge amounts on cycle ways, whereas no other state in Australia, or major developed country, allows cyclists on motorways.

If Beecroft and Cheltenham residents have concerns about the M2 project, or the 5-storey zoning of the Beecroft Shopping Centre, or any other issues, we should be providing a similarly co-ordinated voice representing our concerns. Join the BCCT, attend the AGM in March 2011, and let's get our trust galvanised.

Monday, November 29, 2010

M2 Widening Focus Shift

In Transurban's email about the M2 Widening Project they include this:

"It should be noted that the EA makes reference to works on ‘Kirkham Street Bridge’ which is the official name for Murray Farm Road overbridge.

"It should also be noted that the description of works included in the EA relating to Kirkham Street Bridge was based on the motorway carriageway being widened on the southern side of the M2.

"Following community consultation and feedback during public display of the Environmental assessment, a decision was taken to move the majority of these works to the northern side of the M2 in order to reduce the overall impacts of the work. These changes were explained in the Submissions and Preferred Project Report which was made public on 23 August 2010.

"These modifications were subsequently approved as part of the overall determination for the M2 Upgrade. Details about this change in design can be viewed on the web at: http://www.hillsm2upgrade.com.au/files/m2upgradesubmissionsandpreferredprojectreport.pdf (Section 4.1, pages 233 to 241)."

and later in the email:

"At present we have approval to undertake the work on Murray Farm Road overbridge in two stages, with one lane of traffic (operating on an alternate basis with traffic control in place) maintained during the work.

"The project team, however, is looking at a number of other options as a result of the carriageway works on the M2, underneath Kirkham Street Bridge, being moved from the south to the northern side of the M2. The aim of the review is to determine whether the overall impact of the works on the M2 and Kirkham Road Bridge can be further reduced in any way."

One of the problems for the general public reviewing these monster projects is that the relevant information you seek is, as here, typically on page 233 of an even larger document. No real solution to that of course, but it does make it hard for average residents to find information they seek. In this blog I will try to assist by extracting things that are specifically relevant to the Beecroft and Cheltenham community.

First Home Buyers and Seniors

The NSW Treasurer reviews the cap on First Home Owner grants annually. Reflecting house price increases across the state Eric Roozendaal has now set the cap at $835,000, up from $750,000, bringing Beecroft or Cheltenham more into the sights of first home buyers who would receive a $7000 grant.
First home buyers also get stamp duty savings of $17,990.
People over 65 buying a newly constructed home worth up to $600,000 are exempt from stamp duty. Aaron Gadiel, CEO of Urban Taskforce, suggests that this limit also should have been raised to reflect available new construction. "The abrupt cut-off at $600,000 is distorting housing supply," he says.

Transurban Responds on Kirkham Bridge Issue

I have received an excellent email from a senior manager in Transurban, and then had a long phone call with him, clarifying several issues, and offering to keep me informed of any changes. I am now authorised to publish on this blog anything I receive from Transurban. In return I have offered to post on this blog anything he wishes the local community to know.

Firstly, on the bridge - Transurban are currently authorised to impose single-lane working over the bridge while they are working on widening the spans of the bridge. They have not got approval for any full closure. However now that the project is approved and funded, detailed planning is under way, and that includes considering options that might shorten the period of disruption to locals. One option is to demolish and replace the bridge. But adopting such a disruptive option would require community consultation and a lengthy approval process. So there is no chance of the bridge being fully closed in January!

I am assured that pedestrian access through Chilworth Reserve will be maintained at all times except when specific hazardous work is taking place above. The construction park being assembled under the bridge will not close the footpath over the river.

Normal working hours will be day work except in existing approved places such as the widening of the Epping tunnel, and during work which has to be done at night such as applying asphalt to the finished road surface.

The promised (and mandated) advertising of contact numbers into the Transurban planners will appear in local newspapers this week or next week.

I am seeking clarification on some other issues, and if you need to know anything, or wish to publish your views on any aspect of the M2 widening project, feel free to contact me. Mobile 0417 215 774, or email peter.hewitt@raywhite.com.

Friday, November 26, 2010

Flood Prone Land in the Shire

The NSW Government has introduced a Flood Prone Land policy aiming to improve protection of life and property from threat of flood. Under this policy Hornsby Council has produced the Hornsby Overland Flow Study and Ray White Beecroft has been forwarding relevant letters from the Shire to landlords of affected properties. Draft Flood Planning Maps are available on the Shire website, http://www.hornsby.nsw.gov.au/.
Any contract for sale of a house listed on these maps as being Flood Prone will have that fact entered on the 149 certificate produced by the Shire.

Kirkham Bridge - the RTA Answer

I have obtained a very excellent and comprehensive response from the RTA describing their intentions. Unfortunately their response says:

This email, and any files transmitted with it, are confidential and intended for use by the addressee only.

So at this stage I can’t tell you what it says! All I will say is that the option of demolishing the bridge is being considered. If this concerns you, email the RTA yourself to enquire, at: enquiries@hillsm2upgrade.com.au

A key part of the email, which I am sure the RTA won't mind me telling everyone, is:

Once all potential options for lengthening the bridge have been reviewed and more information is available about the likely impacts associated with each option (including the required traffic management measures) this information will be shared with the community to obtain their feedback and comment prior to finalisation of the works program.

In my email I had asked for the timescale for that consultation period, but their response did not provide that information. I suggest we should now all be writing to advise the RTA, the NSW Government, and anyone else, of our concerns so these can be reflected in their review.

Thursday, November 25, 2010

Project Approval for M2 Widening

This document is available on the HillsM2upgrade.com.au website. It makes no mention of any plans to disrupt road or pedestrian traffic across the Kirkham Road Bridge. One would like to think that is because there is no such plan.

The document requires extensive arrangements for public consultation, and no such arrangements seem yet to be in place. In this week's Northern District Times, the RTA advertises learner driver training, Hornsby Shire advertises a free chipping service, and City of Ryde sends us a reminder that we should be wearing a white ribbon today in support of the International Day for the Elimination of Violence against Women.

As Sherlock Holmes would have noted, "the dog didn't bark"! If none of these advertisements by the key authorities involved notifies us that our community is about to be torn in two, then presumably we can give a sigh of relief and go back to our preparations for Christmas.

RWB Web Site Clocks 10,000 Visits

Some time today or tomorrow our company website, Raywhitebeecroft.com.au, will clock up its 10,000th visit. Of these:
  • 4,200 were 'absolutely unique visitors'.
  • 2,600 were 'loyal visitors' who have visited the site more than 50 times.

Of the visitors from abroad:

  • 57 in UK,
  • 43 in USA,
  • 36 in New Zealand, and same in India,
  • 15 or more from China, Singapore, Hong Kong, Brazil, and Canada.