Transurban have fenced off the construction site under the M2 viaducts in Chilworth Reserve and have posted this sign.
Subscribe to:
Post Comments (Atom)
Reporting on events affecting clients of Ray White Beecroft real estate agency. See raywhitebeecroft.com.au
The signage is totally confusing leaving pedestrians thinking there is an alternate path across the creek when they are just being directed in circles along the southern pathway between Orchard and Allerton roads. The access path across the creek must be maintained during the works.
ReplyDeleteAccepting that the path location may change as the work progresses there is no excuse to completely block access across the creek. This must be managed to accommodate both the right of way and safety concerns. If this means moving the fence corridor regularly or employing a safety crossing flag person then so be it. Pedestrian gates should not be found locked shut!